Currently one of Blint Design + Construction’s projects in Brighton East consisting of an Upper Storey Extension is at lock-up stage. This is the stage where all external wall cladding and roof covering is fixed, the flooring is laid and external doors and external windows are fixed.
The owners have chosen to keep the front facade of the Californian Bungalow and modernise the rear of the home
Internally we are getting close to fixing stage and it is starting to resemble more of a home rather than a construction site.
In our previous post we talked about Architectural 3D Rendering and the benefit of clients being able to visualise the end result before construction begins. The below image compares the 3D rendering image to the current stage of works